RESUME/CURRICULUM VITAE Aftab Khan 330 Osprey Lakes Circle Chuluota, Florida 32766 USA Phone - +1 407 3657818 e-mail - powerkhan@hotmail.com Aftab Khan US Citizen/Date of Birth->22Sep1952
/Married
Languages: English (Very Fluent-Read/Write/Speak)/Hindi, Urdu (Fluent
Speaker)/Arabic, French (Basic) Availability---Immediate/Open to
Relocation
Objectives & Key Qualifications: Supervisory or Managerial Project Controls, EPC/Turnkey
Planning/Scheduling, or Cost/Scheduling-Very Long Term or Permanent
Assignments. Project Control Manager/Director or Planning/Scheduling Manager/
Director-Energy Sector- Power/Petrochemical/Oil & Gas. B.S. Civil Engineering, M.B.A .Management, 25+ years of experience
(recent Managerial) with stress on Project Controls, Engineering/Procurement
& Construction Planning/Scheduling; L.S. Turnkey, Cost Reimbursable and
T&M Projects; Project Management Maintenance Information Systems,
Estimating, Cost Engineering & Cost Control, Risk Management, Contract
Administration - Power, Desalination, Petrochemical and O&G Industries
with EPC Firms/Consultants, Utilities, Turnkey Equipment
Suppliers/Constructors, Oil & Gas Majors. Education: 08.1981: M.B.A., Management, Southern Illinois University (S.I.U.),
Carbondale, Illinois, USA, (Also, was Graduate Assistant, School of Physics
& Engineering). 04.1977: B.S. Civil Engineering, Indian Institute of Technology
(I.I.T.), Kharagpur, West Bengal, India. 04.1969: I.S.C.E. (High School Certificate-sponsored by Cambridge
University, England), St. Mary’s High School, Mumbai (Bombay), India. Computing Skills: PMS - IV/CMS (Stone & Webster Engineering Corporation), PREMIS
(Public Service Company of Colorado/Xcel Energy), QRS (Saline Water
Conversion Corporation -SWCC - Saudi Arabia), Primavera Project Planner
3.1-SP3/ P3e/P5, P6, P7, P8.1, P8.2-EPPM, Web/ "Hard Dollar" Total Cost Management/Oracle-Primavera
"Pertmaster"- Risk Manager/Acumen Fuse-Risk-360 (Basic)/MS Excel -
Word - Powerpoint - Outlook (2003/2007)/Adobe Acrobat. References: Available upon request. Experience: -------------------------------------------------------------------------------------------------------------------------------- 2013-12
- 2013-12 Wood Group/Jacobs
Engineering Group, Secunda, South Africa/Client---SASOL/SASTECH---Coal
Gasification/ Synthetic Fuels Facility, Secunda, South Africa Lead
Planner/Scheduler --- VOC, Volatile Organic Compounds Abatement Projects
"Conceptual/Feasibility Stage" Assignment at SASOL's Coal
Gasification/Synthetic Fuels Facility in Secunda, South
Africa---Employed as Consultant by Wood Group/Jacobs Engineering Group.
Responsibilities included Developing a Erection, Installation/
Commissioning/Start-Up Level 2 Schedule using Primavera Professional
Version7.0/8.2, MS Excel/Word 2010, Adobe Acrobat---with Activities
Formulated, Sequenced and Optimized at the Work Package Level (By
Unit/Sub-Unit/Location---Module Yard Pre-Assembly, Field Installation/Work
Package) Cross-Referenced with appropriate Erection/Installation Quantities
& Commodities---derived from MTOs, Plant Drawings etc.---for the 5 VOC,
Volatile Organic Compound Plants, which were designed to treat hazardous
emissions emanating from the Coal Tar Settling/Separation Tanks, the Coal Tar
being produced as a result of the Gasification Process. The Objective of
Developing Quantity/Commodity Loaded Schedules (with further envisioned
Resource Loading of Manhours, Costs) was to provide the
Client---SASOL/SASTECH---with the insight and feasibility of executing the
Works---with emphasis on the Planning/Scheduling, Project Controls Aspects
and related Costs of Implementing the Projects. 2012-09
- 2013-06 Integrated
Consulting (Project Management Services), Houston, TX/Client-Samsung
Industries, Seoul, Korea Project
Controls/Project Management Consultant
Home -based Project Controls/Project Management Consultant providing guidance
as regards Tools/Processes/Procedures to be adopted to bring Power/Energy
related Projects on track in the Conceptual, Execution and Close-Out Phases
of Projects/Programs undertaken. Provision of specific Methodologies as it
relates to Earned Value, Portfolio Management, measurement & analysis of
Projects to gauge Project "Health"; Project(s) Operations,
Implementation "Gap Analyses" Investigations and subsequent
Solutions to Issues identified at various stages of EPCC Implementation
- Project Controls, Contract Management, Risk Management, Project Management
focus - to ensure successful execution of Projects, aligned with the
Objectives and Strategies of all stakeholders. 2011-07
-
2011-10
Siemens Ltd. (on
Contract to JV-ASC Contracting Company-Al-Arrab Contracting, Saudi
Arabia/SEPCO III, Beijing, China) - Time Scheduler/Project Controls
Consultant, Client-SWCC, K.S.A.-Ras Al Khair Power Plant
Serving in a Planning/Scheduling and Project Controls Consultant role-for
this EPCC $4.5 Billion Power Project (2600 MW Total Output-Simple and
Combined Cycle configurations with all accompanying common areas and support
facilities). Developing Planning/Scheduling and Project Controls Procedures
(& driving them through Implementation), “Integrity” Validation and Estimation
from Scope-Manhours/Dollars, Resource/Cost Loading of “Master” Level 3 EPCC
Schedule (Primavera P7 Format)-and derivation of Project Controls Data
therein (SPI/CPI/SV/CV/ETC/EAC) for Trending/Reporting/Managing the condition
of the project, Implementation of Project Controls “Methodologies” to assure
accurate and meaningful reporting by the 17 Subcontractors for the Project.
Supervised 5 Project Controls Personnel. Analyses,
Reporting, Forecasting-gauging the “health” of the Project at periodic
intervals and providing corrective actions and recommendations-with a focus
on Project Controls, Risk Management and Contract Administration. Interfacing
with all Internal and External Stakeholders-including Management of ASC and
Siemens, Subcontractors, EOR-Engineer of Record (Fichtner-Germany),
Client (SWCC-Saline Water Conversion Corporation, Saudi Arabia) and Owner’s
Engineer (Poyry)-at all levels of Management to facilitate , implement and
execute the Works-taking into account all the relevant Project Parameters
(seamless Construction Execution, Constraints to Execution, Interfaces
between and amongst all stakeholders, Timely Approval & Issue-Delivery of
Specifications/Drawings/Equipment & Material), Risks, Logistics and
General Administration aspects to assure adherence to Time, Budget, HSE,
Quality aspects of Work Program and ultimate achievement of Contractual Key
Milestones, Guaranteed Completion Dates-both from the Client and
Subcontractor perspectives. 2010-11
-
2011-03
Jacobs
Engineering Group, Reading/Winnersh-Berkshire (UK)/Greenville, South
Carolina, USA - Project Controls Manager (Contract)/Client- Marafiq, Kingdom
of Saudi Arabia (Yanbu 2 Power &Water Facilities, Yanbu, K.S.A.)
Strategic Planning/Scheduling and Project Controls-developing Summary and
Level 2 EPC Schedules and “What-If” Scenarios (utilizing Primavera P3.1 and
P6.2) for Optimum Execution & Implementation of Work Scope for Marafiq’s
Yanbu 2 Power & Water Project- which included Power & Water
Facilities (3 Arabian Light Crude/HFO Fired 650mw Thermal Units/60,000cm per
day Multiple Effect Distillation Desalination Units), Marine Intake
Facilities (which included 10 Seawater Pumps/Coarse, Drum Screens/Stop
Logs/Electro- Chlorination Plant/Intake-Outfall Structures), Fuel Facilities
(16 ALC/HFO/Potable Water/Process Water Tanks & Auxiliaries), Seawater
Cooling Pipeline Network (20KM/3 x 2.8m & 1.5m diameter->3 Total
Supply/Return/Spare Pipelines, Valve Chambers-for 60,000cm per day
Desalinated Water & 60,000cm per hour Cooling Water for Royal Commission
Industrial consumers). EPC Bid Evaluations & Scoring-Project Controls
focus- for the 4 Packages described above; raising Bid Queries,
Clarifications, Comments and Final Analyses/Selection of EPC Contractors
–which included developing spreadsheets comparing Contractors’ Timelines,
Manhours, Overall Execution philosophy and Estimating & Projecting
probable Costs for EPC Execution by all contractors. Analyzing Contractors’
Overall Strategy, providing Optimum Implementation Solutions-Project Controls
focus-in Interim/Final Reports to Marafiq (Client); Reinforcing Crucial
Planning/Scheduling and Project Controls Input to EPC Request For Proposal
(RFP) to Contractors; Developing Comparative Planning/Scheduling
Fragnets/Studies (derived from original EPC Level 2 Schedule) addressing
Specific Package Contractors’ submittals/contributions (analyses aided by
Primavera Risk Manager)-elaborating on Interfaces, Critical Path(s),
Manufacturing/Delivery of Critical Equipment/Components, Construction,
Commissioning - to support Marafiq/Jacobs indicated dates for Turnover,
Completion and Milestone Acceptance. 2009-10
-
2010-06
ILF (Ingenieurs
Lasser Feizlmayr) Consulting Engineers, Innsbruck (Austria)/Munich
(Germany)-Lead Planning/Scheduling Engineer; Lagos, Nigeria/Client-Mobil
Producing, Nigeria~Nigerian National Petroleum Corporation
Functioning in a Lead Planning/Scheduling and Project Controls role on FEED
and EPC portions of a 500 mw Power Plant/Transmission Line/Gas Pipeline JV
project-FEED, resource loaded EPC Schedule Options development and
justification, special project control related studies, cost estimation
studies & cash flows, procedure review & evaluation, demonstrated
capabilities in mentoring and development of 2 Nigerian project controls staff.
Establishing policies and guidelines, appropriate project control practices
for the organization based on intimate knowledge of widely accepted Project
Controls concepts and principles. Utilization of Primavera P3.1 and Primavera
Risk Manager to build, analyze and derive meaningful Project Controls Data
from EPCC Level 3 Schedules, recommendations to augment/ introduce tools and
processes to enhance Project Controls deliverables and focus. Being aware of
commercial, contractual and project controls strategies and managing their
utilization on these financially significant and multiple projects at the
Enterprise Level. Key member of ILF Management Team-providing Client with
rationale and justification of basis for development and issuance of Project
Controls deliverables. 2008-10
-
2009-02
Shaw Group/Stone
& Webster Asia Inc. (SWAI), Hong Kong - Project Controls Manager,
Client-China Light & Power~Exxon Mobil
Responsible for-Managing around 8 SWAI Project Control personnel, in a
EPCM role- functions which included Planning (Primavera P3.1), Formulating
& Monitoring Resource Loaded Schedules; Contract Administration, Cost
Control & Accounting for SWAI at Castle Peak Coal Fired Power Station
(4x800mw supercritical coal plants)-scope of work included emission
controls-FGDs (Flue Gas Desulphurization), SCR/BOFA (Selective Catalytic
Reduction/Booster Over Fire Air) and other related work to make plants
environmentally compliant by Feb 2011. Oversight, Due Diligence over EPC
Contractors’ Project Services function-by Streamlining EPC Scheduling (
assuring proper Planning, Reporting, Trending, Criticality), Cost
Control/Cash Flows, Contract Administration, Field Coordination-
SWAI/Contractors -and assuring Tools/Processes/Procedures are in place to
optimize Project Controls efforts. 2008-06
-
2008-09
Siemens Energy
Inc., Orlando, Florida, USA; Planning-Scheduling Engineer/Client- GenPower
LLC (Massachusetts)
Planning/Scheduling for Commissioning a 695 megawatt supercritical coal
plant-Longview- in Maidsville, West Virginia- meetings with Vendors~
collection/entry of data into P6.1 (Primavera Enterprise) of the
scope/sequence of commissioning activities after retrieval of information
from Vendors and Siemens, aiding in Integrating commissioning schedule with
Master Schedule. Utilized P6.1, MS Office, Adobe Acrobat. 2007-10
-
2007-12
KJO (Kuwait Joint
Operations-Saudi Aramco/Kuwait Oil Company), Cairo, Egypt; Project Controls
Specialist/Business Administrator
Responsible for Managing (around 10 KJO personnel) in a PMC role-functions
which included Planning
(Primavera P6.0) & Monitoring Resource Loaded Schedules, Cost Control/Forecasting/Cash
Flows, Contract Administration, Procurement, Document Control (Primavera
Contract Manager/Expedition)- for KJO at main Contractor’s Offices in Cairo
for US$772 Million Al- Khafji (Saudi Arabia/Kuwait partitioned zone) Offshore
project. Oversight, Due Diligence over Contractor Project Services function,
Business Administration for KJO-by Streamlining EPC Scheduling (by assuring
proper Planning, Reporting, Trending, Criticality), Cost Control,
Procurement, Contract Administration, Document Control (initiated reduction
of duplicate/superfluous paperwork by 30%); and Coordinating Engineering
& Procurement functions (Contractor->ENPPI) and
Fabrication/Installation efforts with Contractors, KJO Site Installation
Team. 2007-05
-
2007-09
Alstom Power,
Zurich (Baden), Switzerland; Senior Project Planning Engineer (Lower Level
Executive MK03)
Strategic Planning/Scheduling, Project Controls, Monitoring, Forecasting,
Trending, Reports, Client Coordination (P3-Ver. 3.1, P3e/c-Ver. 5.0; Alstom’s
EPC Tool Set, Progress Supporter, MS Office)- Combined Cycle Projects
(particularly Staythorpe UK Power Project- containing Alstom’s GT26
Combustion Turbine machines)-on International Ventures with an average US$
value of circa 1.7 Billion. 2006-12
-
2007-05
Riley/Babcock
Power, Charlotte, North Carolina, USA; Manager, Project Controls
Mentored and Supervised 3 Project Controls Personnel working on Power Plant
Betterment/Environmental Modification Projects (FGDs, SCRs) out of
Riley/Babcock Power’s Charlotte, NC, USA office. Also, hands-on Strategic
Planning & Scheduling/Monitoring on an Earned Value basis (P3-Ver. 3.1)
Resource Loaded Schedules, Cost Forecasting/Financial Control/Cash Management
(Deltek’s Costpoint software, MS Office), Reporting/Trends, Risk Management,
Contract Administration, Client Coordination. 2005-09
-
2006-11
Siemens Power
Generation, Orlando, Florida, USA; Part Time Project Controls Consultant/Self
Employed
Responsibilities included Analyses of Delays postponing completion of project
according to Baseline Program for the Kirkuk Iraq Projects (Simple Cycle
Project - Siemens V64/V94 machines); including Schedule Analysis, Resources
& Equipment/Material Usage/Forecast review, Subcontractor Execution &
Implementation Plan examination, aiding in the Financial/Commercial Impact
studies and preparation of relevant Reports to be used as a basis for Claims
Presentations (Client – US Aid/Bechtel International)-Using P3.1. Self
Employed – Day Time Internet Stock /Currency Investment Trader for Personal
Income/Earnings enhancement. 2000-01
-
2005-09
Siemens Power
Generation, Orlando, Florida, USA; Senior Project Controls Engineer / Project
Controls Manager
Developed summary & detailed Resource Loaded EPC/Equipment Supply
schedules for Simple & Combined Cycle Power Plants upto 600 MW (Including
Industrial Steel/Concrete Structures- Generation/Control Room Buildings &
Field Erected Tanks), maintained/monitored schedules, aided in selecting
General Contractors’ Lead Project Controls Representative and continuously
guided/mentored (2 Project Controls Personnel on average per project) General
Contractors’ Project Control function, reviewed/assured adherence to
commercial, financial and technical aspects of LSTK/T&M Contracts by
Clients/Consultants/Contractors/Vendors, provided corrective
action/recommendations & developed/monitored cost/schedule forecasts,
& variances for Domestic/Int’l projects (utilizing P3-3.1, Primavera
Enterprise 5.0 for Power/Process and E/C, MS Office, Lotus Notes, SAP R/3
4.6-Finance Module). Was presented several Performance Awards and Citations. 1996-03
-
1999-12
Black &
Veatch/Black & Veatch Pritchard, Overland Park, Kansas, U.S.A.; Senior
Planning/Scheduling Engineer
Developed summary EPC & Start-up/Commissioning Power Plant schedules for
various technologies at domestic/international locations (Including
Industrial Steel/Concrete Structures-Generation/Control Room Buildings &
Field Erected Tanks), and specifically developed, maintained & monitored
detailed Resource Loaded EPC schedules for Pulverized Coal, Simple &
Combined Cycle Power Plant projects (upto 600MW) & SCR Modifications in
Indonesia, Pakistan, Korea & the USA (utilizing P3 2.0b & 3.0,
B&V’s Powertrak Scheduling System, Lotus 1-2-3, MS Office); Mentored New
Hires and Site Project Controls Personnel (2 Project Controls Personnel on
average); Trending/Forecasting/Cash
Management also formed part of responsibilities. Was Presented Performance
Certificate. Tenure included working @ Black & Veatch/ Pritchard as a Sr.
Project Controls Engineer on major Petrochem/Oil & Gas Projects-including
“Coke Gasification to Ammonia” and LNG Plants-Domestic/Overseas. 1994-05
-
1995-05
Gulf Consolidated
Contractors, Doha, Qatar; Project Services Supervisor
Prepared and monitored computerized schedules (Primavera Project Planner-P3,
Lotus 1-2- 3, Microsoft Office) for construction control of LNG (Liquefied
Natural Gas) infrastructure development project for Client-Qatar Petroleum
(QP) at $5 billion LNG plant at Ras Laffan. Attend progress
review meetings, formulate weekly progress reports, prepare interim
valuations for ongoing projects, tenders for submission to prospective
clients, and follow up post-tender enquiries and submittals; supervised
Project Services function (2 Personnel on average). 1993-10
-
1993-12 Humphreys &
Glasgow, Mumbai (Bombay), India; Principal Planning Engineer/Independent
Project Controls Consultant
Produced feasible Project Programs - Engineering and Construction - using
precedence network techniques with specific regard to contractual
requirements, milestones, time and resource limited scheduling and carried
out performance monitoring for this DEG (Diethylene Glycol) to TEG
(Triethylene Glycol) conversion construction project costing $50 million
using P3. 1992-01
-
1993-10
Independent
Project Controls Consultant/Contractor, Mumbai (Bombay), India
Worked as Independent Project Controls Consultant/Contractor – providing
services to Manufacturing/Industrial/Commercial facilities’ EPC Firms,
General Contractors, Owners (Turnkey Projects ranging from $5 Million~$50
Million)-individually handling planning/scheduling, estimating, quantity
surveying and commercial/cost control functions. 1988-03
-
1991-10
Saline Water
Conversion Corporation (SWCC) - Al Jubail Power/Desalination Plant, Jubail,
Saudi Arabia; Planning Engineer
As Area Planning Engineer mainly accountable for comprehensive co-ordination
of major overhauls and plant betterment outage inspections of
boilers/turbines/desalination units and auxiliaries (Including Industrial
Steel/Concrete Structures-Generation/Control Room Buildings & Field
Erected Tanks) - Phase 1 Operations - 6 x 60 mw oil/gas fired steam turbines,
2 x 30 mw gas turbines & 5400 cubic meters per hour water production
(MSF). Identification, organization, computerization of work scope &
schedules to meet time/manpower restraints on overhauls (Primavera,
Visischedule, Lotus 1-2-3, dBase IV). Supervising & guiding 1 foreman/2
planners in cost engineering and planning, scheduling, coordinating corrective,
preventive and modification maintenance activities for assigned areas - Ph.1
Power/Desalination Plant & Associated Auxiliaries. As Acting
Planning Superintendent (2 Months. of tenure) developed site wide Outage
Program (for the period June ‘89 - May ‘93), for 10 x 120 mw, 42,000 c.m. /
hr (Phase 2 units) & 6 x 60 mw, 5400 c.m./hr (Phase 1 units) - Fossil
Fired/MSF - a long range turnaround/ overhaul/outage and cost control plan
for Power/Desalination Units classifying critical activities to bring
outage inspection program on track. In the same capacity served as Plant
Insurance/Claims Administrator, addressed work areas causing departmental
conflict and focused management’s attention on crucial issues thus aiding in
productivity improvement/budget savings. Supervised 15 planning personnel. 1985-12
-
1987-12
Public Service
Company of Colorado/Xcel Energy - Fort St. Vrain Power Plant, Platteville
(Denver), Colorado, U.S.A.; Scheduling Engineer
As NPD Preventive Maintenance Coordinator (12/85 to 12/86) - was responsible
for complete coordination, administration, and implementation of a plant wide
preventive maintenance program which maintained qualification of equipment
per NRC (Nuclear Regulatory Commission) guidelines. Wrote and implemented NPD
procedure “Preventive Maintenance Planning/Scheduling Implementation” at this
$300 million/330 mw HTGR (high temperature gas reactor). Activities centered
on developing maintenance data base on PPMIS (Power Plant Maintenance
Information System - IBM 8100 mainframe) and scheduling/monitoring activities
on PREMIS PMS. As EQ Scheduler/Overseer (12/86 to 12/87) -
Developed/Scheduled engineering work packages (manual/PREMIS) for deficiency
correction on environmentally unqualified equipment per NRC guidelines &
coordinated (on shift/2 other supervisors) planning, engineering, contractor
manpower & quality control efforts toward scope completion (supervised 4
Planning Personnel and 25 Craft Personnel/Per Shift). 1981-12
-
1985-12
Stone &
Webster Engineering Corp., Boston, Massachusetts, U.S.A.; Beaver Valley Power
Station # 2, Shippingport, Pennsylvania; Field Planning Engineer
As Area Planning/Scheduling Engineer (12/81 to 12/82 & 12/84 to 10/85) -
responsible for Construction Planning/Scheduling of piping- mechanical,
civil, electrical, insulation, instrumentation activities for assigned areas
- Service/Control/Turbine buildings, using S&W’s PMS-4/CMS scheduling-monitoring
information systems at this $3 billion /880 mw PWR (Pressurized Water
Reactor) nuclear power plant. Other activities included Level III contractor
schedule validation, critical path analysis and bulk commodity installation
monitoring. In the capacity of Milestone Cost/Scheduling Engineer (12/82 to
12/84) - prepared studies (CPM schedules/ reports) relative to specific
detail design, construction, procurement and startup which directed the
completion of commodity installation to support system turnover, testing and
milestone acceptance. 1977-08
-
1978-08
Davy Powergas,
Mumbai (Bombay), India - (Subsidiary - Davy International, UK - now
Kvaerner/John Brown E & C, U.S.A.); Site Supervisory Engineer
Major duties involved preparing/updating project schedules, developing
quantities/costs and ensuring their accuracy with project documentation.
Periodically monitored and analyzed costs/variances and provided corrective
action. Expedited delivery of equipment and material from vendor through
installation and aided in engineering - construction coordination efforts at
this $50 million polystyrene manufacturing construction project. Aided in the
design of Industrial Steel Buildings (with paneling) for this project before
taking the project to the field and coordinating their erection (supervised 3
Contractor Construction Supervisory Personnel and 40 Craft Workers on
average). Courses/Certifications/Software/Honors
------- Green Belt,
Certified-Motorola University (January 2007). PMP (Project
Management Professional from Project Management Institute), Certified
(November 2004). Ex-Member->Project
Management Institute (PMI)/Association for the Advancement of
Cost
Engineering (AACE). PMS -
IV/Construction Project Simulation Workshop & Construction Management
Systems (CMS) -- Stone & Webster Engineering Corporation. Evaluated/Provided
Recommendations for P3e-Primavera Enterprise Program-@ Siemens Westinghouse.
Generally cognizant of Sarbanes-Oxley and ISO 9001 & ISO 14001
requirements. PREMIS -Project
Management/Scheduling System, Public Service Company of Colorado/Xcel Energy. PRIMAVERA PROJECT
PLANNER / PRIMAVISION - Certified -- Evans Technology Inc., Atlanta, GA. QRS - Maintenance
Planning & Database System, Saline Water Conversion Corporation (SWCC)-
Saudi Arabia. Several Training
Certificates/Courses taken at Black & Veatch, Siemens Westinghouse (among
others) in Project Controls, Project Management, Business Process Management,
Contracts Administration, HSE, Operations & Maintenance. Senior Project
Controls Engineer on “High Desert” & “Silverhawk” (@ Siemens
Westinghouse)-Power Magazine’s "Power Plants of the Year-2003/2004”. Page 1 of 7 |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|